McKINNEY (Feb. 10, 2015) — Weather permitting, north and southbound mainlanes of U.S. 75 (Central Expressway) will be closed at Bloomdale Road in McKinney for bridge construction on the Bloomdale bridge.

This will begin at 5 a.m. and run through 4 p.m. on Saturday, Feb. 14.

DETOUR:

Southbound traffic will exit at Bloomdale Road (Exit 42A) and continue for approximately .5 mile along the southbound frontage road, through the Bloomdale intersection without stopping. Traffic will then use the next entrance ramp to re-enter U.S. 75 southbound.

Alternating lanes of the northbound side will be closed at various times so there will not be a designated detour for the northbound side.

Backups are expected and motorists are encouraged to seek alternate routes if possible.

 

About TxDOT

The Texas Department of Transportation (TxDOT) is responsible for maintaining 80,000 miles of road and for supporting aviation, rail and public transportation across the state. TxDOT and its 11,000 employees are committed to working with others to provide safe and reliable transportation solutions for Texas by maintaining a safe system, addressing congestion, connecting Texas communities, and being a Best in Class state agency. Find out more at txdot.gov.

Road conditions and traffic updates are available on the drivetexas.org website, on Facebook at facebook.com/txdot and Twitter at twitter.com/txdot or twitter.com/txdotdallaspio.

Motorists also can call TxDOT's toll-free highway condition line at 1-800-452-9292 for roadway information. For non-emergency roadside assistance, motorists can call the Texas Department of Public Safety at 1-800-525-5555. TxDOT’s four goals: Maintain a safe system, address congestion, connect Texas communities and be a Best-in-Class state agency.