McKINNEY (Sept. 19, 2014) — A roadway rehabilitation project is set to begin at the end of the month on SH 5 between FM 546 (Eldorado Parkway) and U.S. 380.

The project is 2.3 miles long and runs through McKinney. Lane closures on the project are expected to take place at night or during off-peak travel hours to avoid impeding traffic as much as possible.

The $1,040,196.58 project was awarded to Peachtree Construction Ltd.

Estimated completion is expected in early November.

 

About TxDOT

The Texas Department of Transportation (TxDOT) is responsible for maintaining 80,000 miles of road and for supporting aviation, rail and public transportation across the state. TxDOT and its 11,000 employees are committed to working with others to provide safe and reliable transportation solutions for Texas by maintaining a safe system, addressing congestion, connecting Texas communities, and being a Best in Class state agency. Find out more at txdot.gov.

Road conditions and traffic updates are available on the drivetexas.org website, on Facebook at facebook.com/txdot and Twitter at twitter.com/txdot or twitter.com/txdotdallaspio.

Motorists also can call TxDOT's toll-free highway condition line at 1-800-452-9292 for roadway information. For non-emergency roadside assistance, motorists can call the Texas Department of Public Safety at 1-800-525-5555. TxDOT’s four goals:  Maintain a safe system, address congestion, connect Texas communities and be a Best-in-Class state agency.