Closures on the Sam Rayburn Tollway (SRT) near Hebron Parkway are scheduled to occur continuously Sept. 14-17 and again Sept. 21-23, according to the North Texas Tollway Authority.

The following closures are scheduled on the SRT main lanes:

  • Two southbound right lanes near Hebron Parkway will be closed continuously from 8 p.m. Friday, Sept. 14 through 6 a.m. Monday, Sept. 17.
  • Two southbound left lanes near Hebron Parkway will be closed continuously from 8 p.m. Friday, Sept. 21 through 6 a.m. Sunday, Sept. 23.

The closures are part of the NTTA Maintenance Department's ongoing pavement repair project on the western portion of the SRT. Since the start of the project, cracked and deteriorated pavement has been removed from the toll road's main lanes and frontage roads.

The entire project will end in late 2012, weather permitting. Additional lane/ramp closures will be announced, as needed.

Message boards will be placed along the roadway to alert motorists of the closures. All closures are subject to weather conditions and will be postponed if necessary.

For more information about upcoming lane closures and traffic-related news along NTTA roadways, call (214) 224-3030 or go to the "Scheduled Lane Closures" listing at www.ntta.org.